Prepare role-appropriate guidance covering normal operation, routine checks, safe shutdown and basic issue reporting.
Site readiness
Access, layout and utilities confirmed.
Interface verification
Mechanical and electrical connections checked.
Trial run observation
Functional operation reviewed before handover.