Case Study
Cleanroom Utility & Centralized Feeding Project for Cosmetic Packaging Production
A turnkey utility and centralized feeding project for a 3,000 m² cosmetic packaging injection molding workshop in Nantong, integrating material drying and conveying, cleanroom-oriented feeding, water, electricity, compressed air, and dedicated distribution for 32 injection molding machines.
- Packaging
- Industry
- Nantong, China
- Project Location
- 9 Weeks
- Project Cycle
- 32 Machines
- Connected
Client Overview
Anonymous Cosmetic/Beauty Packaging Manufacturer
A professional injection molding manufacturer producing plastic packaging components for international beauty and cosmetics brands.
| Industry | Packaging |
|---|---|
| Plant Size | 3000 m² production facility |
Challenge
The customer required a centralized material handling and utility system for a cleanroom injection molding workshop producing cosmetic packaging components. The main engineering challenge was to ensure that the correct material was delivered reliably to each of the 32 injection molding machines while maintaining the cleanliness requirements of the production environment. Material segregation during conveying also had to be minimized to maintain consistent material composition at the machine. At the same time, dust-generating and noisy auxiliary equipment needed to be separated from the clean production area as much as possible. The water, electrical, compressed-air, and material piping systems also had to be organized in a clean and structured layout suitable for a high-standard cosmetic packaging production environment.
Solution Highlights
Engineered for efficiency
- Dedicated material supply area
- Controlled material routing
- Machine-side material conditioning
- Closed-loop process cooling
- Hierarchical electrical distribution
Solution Overview
Five connected subsystems
Our integrated system ensures smooth material flow from storage to production.
-
1
Dedicated material supply area
-
2
Controlled material routing
-
3
Machine-side material conditioning
-
4
Closed-loop process cooling
-
5
Hierarchical electrical distribution
Project Outcomes
Outcomes with evidence requirements
Connected injection molding machines
Centralized feeding and factory utilities were integrated for 32 injection molding machines.
Documented production facility
The project scope covers the recorded 3,000 m2 cosmetic packaging workshop.
Recorded project cycle
The documented utility and material handling project cycle was nine weeks.