NanJing 30 IMM Central Feeding System with utility planning
A turnkey whole-factory utility and centralized feeding project in Nanjing, covering the layout of 30 injection molding machines, centralized material feeding, chilled water, electricity, compressed air, real-time energy and material monitoring, and reserved capacity for future expansion.
- Home Appliances
- Industry
- NanJing, China
- Project Location
- 2 months
- Project Cycle
- 30 Machines
- Connected
Client Overview
Nanjing Yongxin Plastic Industry Co., Ltd.
An injection molding manufacturer producing plastic components for the household appliance industry, operating a multi-machine production facility in Nanjing, China.
| Industry | Home Appliances |
|---|---|
| Plant Size | 5000 m² production facility |
Challenge
The customer was establishing a new injection molding facility and required the complete production infrastructure to be planned from the ground up. Rather than building separate utility and material handling systems around individual machines, the customer wanted an integrated factory-wide solution that could provide stable material supply, chilled water, electricity, and compressed air to 30 injection molding machines. A major objective was long-term scalability. The factory needed to remain efficient and technologically relevant for many years, while allowing additional machines to be installed without major reconstruction of the existing infrastructure. The customer also required greater visibility of material consumption, electricity usage, compressed-air consumption, water pressure, and water temperature instead of relying only on manual observation.
Solution Highlights
Engineered for efficiency
- Factory layout and expansion planning
- Centralized material room
- Duty and standby chilled-water system
- Metered electrical distribution
- Utility and material monitoring
Solution Overview
Five connected subsystems
Our integrated system ensures smooth material flow from storage to production.
-
1
Factory layout and expansion planning
-
2
Centralized material room
-
3
Duty and standby chilled-water system
-
4
Metered electrical distribution
-
5
Utility and material monitoring
Project Outcomes
Outcomes with evidence requirements
Connected injection molding machines
The centralized material and utility systems were engineered for 30 injection molding machines.
Documented production facility
The project scope covers the recorded 5,000 m2 production facility.
Recorded project cycle
Planning, installation, commissioning and handover were completed in approximately two months.
Reserved expansion capacity
Pipelines and installation space were reserved for five future injection molding machines.