Technical ArticleDrying PET and Regrind Without Hydrolysis Damage
PET needs 0.005 percent moisture and minus 40 C dew point. Here is how to dry preform resin and regrind without degrading molecular weight.
Engineering intelligence
Technical guides, product selection methods, project evidence and industry intelligence, reviewed by engineers and organized for real factory decisions.
Production questions
Open a system path based on the production problem, then review the connected equipment families.
Published information
Browse each published item by its content type and last-updated date.
Technical ArticlePET needs 0.005 percent moisture and minus 40 C dew point. Here is how to dry preform resin and regrind without degrading molecular weight.
Technical ArticleA hopper dryer heats; a desiccant dryer controls dew point. Here is the resin list that decides which one you actually need, and when the upgrade pays back.
Technical ArticleHow to dry hygroscopic plastics correctly: target moisture by resin, the dew point you actually need, drying time tables, and how to size a hopper or desiccant dryer.
Technical ArticleThis guide explains how to size an energy-efficient mold temperature controller for injection molding, compares water-type models by heater and pump.
Technical ArticleLearn how energy-saving mold temperature controller types work, compare available capacities, and select a suitable unit for industrial mold heating.
Technical ArticleLearn how water-type and oil-type mold temperature controller designs differ, how to size heater and pump capacity for your molds, and what to verify.
Technical ArticleA mold temperature controller holds a mold at a stable preset temperature to shorten cycle times and improve part quality, and this introduction explains.
Technical ArticleAn energy-saving mold temperature controller holds a stable mold setpoint with right-sized heaters and pumps, and this guide explains how overseas buyers.
Published project records
Use each published case record to compare application context, equipment configuration and the result reported for that project.
Confirm scope and operating conditions before applying a result to a different production line.
Browse Project Records